Well, brew day is done, and the beer is resting in the fermenting chamber. ( basement closet) Due to problems with the new mash heat control, I struggled with mash water temperature, and sparge water temperature. Undershot the expected OG from 1.05 to 1.04. ( at 79 degrees) . It's a learning process. Time will tell how the beer tastes.
Bob