When using the Box for late extract addtion; what portion of the extract is it assuming is added late? Does the program assume a specific percentage up front and late additon such as:
1/3 up front with 2/3 late ?
10 % up front w/90 late?
etc?
Or do you need to break up the extract into two seperate line item additions under the "grain bill"? One being a portion up front in the full boil w/no late addition box checked.. and then a seperate line for the remaining portion of the extract added and then that box checked?
1/3 up front with 2/3 late ?
10 % up front w/90 late?
etc?
Or do you need to break up the extract into two seperate line item additions under the "grain bill"? One being a portion up front in the full boil w/no late addition box checked.. and then a seperate line for the remaining portion of the extract added and then that box checked?