sbbish
Master Brewer
- Joined
- Jan 30, 2011
- Messages
- 53
- Reaction score
- 0
I haven't found either of these bugs previously reported in the forums.
Bug#1: The calendar only shows 5 rows. If the month runs longer than that, you don't get to see the end of the month. For example, look at January of this year (2011). January 1st starts on a Saturday, which appears on the first row in the Calendar. The next four rows of the calendar take you through Saturday, January 29th. But January 30th and 31st don't show up at all. You have to go to the February calendar month in order to see the last days of January. This problem happens again in July and October of this year. I realize this only occurs on certain occasions and depends on how the month falls, but it is frustrating not to be able to see the entire month when you are on that month's calendar view.
Bug#2: When the year starts over, any brewing data on the calendar from the previous year disappears. I brewed a beer in December 2010. The calendar showed it would sit in Primary and then Secondary on into January. But when the new year arrived, all the data vanished. The calendar no longer shows me when the beer was scheduled to finish Secondary. If I go back to December to see when I brewed it, that data is gone, too. In fact, all of my brewing schedules from the previous year are gone. I can't go look at the calendar to see what I brewed during a specific month last year. Yes, the information is still stored with the individual recipes, but if I'm going to have to open each individual recipe and then calculate dates from that, then the calendar is not providing me much use.
Thanks.
Bug#1: The calendar only shows 5 rows. If the month runs longer than that, you don't get to see the end of the month. For example, look at January of this year (2011). January 1st starts on a Saturday, which appears on the first row in the Calendar. The next four rows of the calendar take you through Saturday, January 29th. But January 30th and 31st don't show up at all. You have to go to the February calendar month in order to see the last days of January. This problem happens again in July and October of this year. I realize this only occurs on certain occasions and depends on how the month falls, but it is frustrating not to be able to see the entire month when you are on that month's calendar view.
Bug#2: When the year starts over, any brewing data on the calendar from the previous year disappears. I brewed a beer in December 2010. The calendar showed it would sit in Primary and then Secondary on into January. But when the new year arrived, all the data vanished. The calendar no longer shows me when the beer was scheduled to finish Secondary. If I go back to December to see when I brewed it, that data is gone, too. In fact, all of my brewing schedules from the previous year are gone. I can't go look at the calendar to see what I brewed during a specific month last year. Yes, the information is still stored with the individual recipes, but if I'm going to have to open each individual recipe and then calculate dates from that, then the calendar is not providing me much use.
Thanks.